DJM live site: rebates, Level 2 and EV

Review pack, 20 Oct 2026. Draft, nothing is live. From the 15 Oct DJM catch-up (ClickUp task 14zda9v5776). For DJM's current live site only. Each page preview is the real live page with the new copy swapped in: orange outlines mark every change, and the bottom bar shows the Google title and meta.

What changed, and why

Stage 1: the rebate page

Stage 2: rebate lines on other pages, plus menus

Stage 3: the Level 2 page

Stage 4: the EV chargers page

The "battery in the Level 2 heading" question: adding one word wouldn't be keyword stuffing, but the Level 2 page is about network work, not batteries, so the heading stays as it is. Batteries are covered by the rebate page.

Open before anything goes live

  1. Re-check the Clean Energy Regulator page that the rebate tiers are unchanged on the day we push.
  2. Optional, for the EV page: if DJM name the charger brands they install (e.g. the Tesla Wall Connector, about 390 searches a month, Ubersuggest, Australia), we can add them.

DJM are confirmed as set up to offer Home Energy Saver loans (Jack, 20 Oct).

How it goes live

Through our Partner Bridge plugin: every page is backed up first and can be restored exactly, one unchanged page is pushed as a test, then the edits go up, the cache is cleared and every page is checked live. Text swaps only, so no layout, image or style changes.